120 is an NG15 2-8-2 tender locomotive. Originally built for South Africa, it was previously bought by the Welsh Highland Railway Limited to build up the stock of locomotives ready for potential full line operation before being sold.
120 was built by Société Anglo-Franco-Belge for South African Railways (SAR) to their NG15 design. 120 is from the second batch of NG15s built in 1949. It carries builder’s number 2667.

It was delivered to Walvis Bay and commissioned onto the Otavi Railway. The Otavi Railway was regauged to cape gauge in 1960 and 120, along with the other NG15s was transferred to Port Elizabeth to work the Avontuur Branch. 120 was withdrawn from service in 1985 due to the declining amount of work for steam locomotives.

The loco was purchased by the Welsh Highland Railway Limited and was at Gelert’s Farm Works by 1994. Rebuilding had started in 1997. The boiler cladding, super heater elements and the dome were removed around that time. The boiler was lifted off the frames and it was reduced to a kit of rusty parts. Its rebuild was expected to take 2 1/2 years, but progress stopped due to a shortage of funds and external circumstances.

120 was subsequently sold in 2009 and removed from the Welsh Highland Heritage Railway, then in 2024 ownership was transferred to the DLRHT.
Historic Photos
Pre-eminent South African railway historian Leith Paxton has sent these very rare photos that show 120 in service with South African Railways. Interestingly it is paired with a different tender to that it left the manufacturer with, and to that it arrived in the UK with.



We were also sent this interesting photo from the Transnet Heritage Archive, showing 120’s tender when brand new. Of interest are the ladder and water tank mounting brackets on the buffer beam and tender tank which we still have, and the original style rear lamp which was much smaller than the one fitted to the front of the locomotive. Note also the German style coupling fitted for operations in Namibia.
Philip Hindley photos
It’s the 12th of September 1973, and number 120 is pictured hard at work for South African Railways.
In the colour photo the train has just crossed the Van Stadens Viaduct and is on the short uphill section into Van Stadens Station. The other four black and white photos were taken at the station.
All photos are copyright P. Hindley and are reproduced here with permission.
Restoration
14th October 2026
A common problem on NG15s is wastage of the rear frame stretcher. It sits directly under the ashpan and gets covered in a mixture of corrosive, hot ash and water from drenching the ashpan when the fire has been cleaned out. It is a large and very complicated steel casting, and 120’s is both heavily wasted and distorted.
Discussions are currently ongoing with Steam Workshop who have the frames at the moment on how to deal with it. The current plan is to drill out the fitted rivets holding it in to allow it to be removed and assessed for potential repair. That is the approach that was taken with 134 at Dinas. It is possible that it may be better to completely replace it with either a new casting or a fabrication, but that is a very expensive option.
Images courtesy of Steam Workshop.
28th July 2026
120’s gauge panel is now complete, painted in SAR buff with the new varnished English Oak gauge mounting pads bolted up. It is now awaiting the return of the steam chest and boiler pressure gauges and vacuum brake gauge from Valley instruments in Nottingham. One of the cylinder covers has received another coat of gloss black.
8th June 2026
The first of 120’s cylinder covers is being painted. The transformation from rusty, holed and dented part to nearly ready for re-installation is really impressive.
3rd June 2026
One of the cylinder covers is now complete after extensive rust repair and looks wonderful. A huge thanks is due to our in house fabricator Al for his work.
13th May 2026
The last of the pony truck under keeps have been successfully removed, which has allowed for the removal of the last wheel set. That has now been cleaned and had its first coat of paint. Work has started on the remaining driving wheel sets and the first of the tender ones.
The gauge mounting panel is now complete and ready to go back on the boiler. The two pressure gauges and vacuum gauge are still with Valley Instruments in Nottingham awaiting rebuilding.
21st April 2026
The cotton waste has been removed from the rear pony truck axleboxes. One underkeep has been persuaded to come out, along with all of the remaining studs on that side.
15th April 2026
The ‘mushroom’ for one of blow down valves has had the remains of the old fixing bolts removed and been cleaned. It’s upside down in this photo, normally it is mounted the other way up inside the baffled cans shown on the previous update. There are two of these on the locomotive, but so far only one has turned up in the stored parts. Hopefully the other one will be in the bottom of a box somewhere.
7th April 2026
The gauge mounting pads and mounting panel are approaching completion with a couple more coats of varnish and paint left to go. The replacement baffled diffuser cans for the blow down valves have also arrived from the manufacturer and look wonderful.
13th March 2026
120’s firehole doors have had a coat of heat resistant paint and the spindles have been cleaned and had the old spacers heated up and removed. Both of the large 7″ face pressure gauges we have sourced for 120 have arrived now and fit the oak mounts perfectly. They now await dispatch for rebuilding and re-calibration. The rear pony truck stripping has begun and the front one is in storage for now while that takes place. The regulator quadrant has been removed from storage pending cleaning and inspection. We have started seeking quotes for pattern making and casting of the rear frame stretcher assembly that is mounted under the ashpan. It is very prone to corrosion on NG15s, and 120’s is no exception.
19th February 2026
120’s new gauge mounts have been manufactured from oak. These bolt to the steel panel above the firebox that holds all of the steam manifold controls.
17th February 2026
The foundry in South Africa have prepared the patterns for 120’s front number plates. These mount either side of the front buffer beam as in the photo of number 117 below. The pattern for the loco number plate mounted to the rear of the tender is being prepared as well.

12th February 2026
120’s main components have moved house this week as the building they were in has been re-let. They’re now safe and sound with Steam Workshop in Leeds for further storage.
27th January 2026
The front footplate has had the handrail mounting holes drilled out to accomodate the new bolts as it’s the best place to store them, plus they look nice. A slightly redder shade has been tried on the gauge panel but now looks too red. The tender ladder is now completely finshed and is back in storage.
15th January 2026
The brand new front running plate handrails have arrived from a local engineering firm. They’ve done an absolutely superb job of following the original drawings. These will go into storage until the running plate is finished.
The gauge and valve panel has received some more straightening as the gloss paint revealed a bit of a bend in the middle. It is now straight enough – the locomotive is not new and should wear some of its life scars when it’s done. A custom colour mix has been made which now looks much closer to the colour that SAR used, rather than specified! It is 2 parts BS Kalahari tan and 1 part Stroudley ‘Improved Engine Green.’ The camera doesn’t do a great job of showing it but it looks correct in real life.
6th January 2026
The cab gauge and valve handle plate is being worked on. These have bronze bushes when new, but they frequently wear out or go missing. This results in irregular wear to the mounting plate. Fortunately on 120 only one hole was effected, and this has been repaired as below by cutting a hole in fresh steel stock then welding it in to the original panel.
It has had its first coat of what should be the correct colour, but it is much more yellow than the tan it should be. A bit of BS colour chart searching will be done to try and find a better match.
The correct colour in the cab of NG15 number 17.

29th December 2025
120’s tender ladder is now complete and has its first coat of black paint. Because it was so heavily damaged it was necesssary to remove all of the rungs so the sides could be straightened and the missing mounting parts replaced in a way that made a reasonable degree of accuracy easier to achieve.
The leading pony truck wheelset is now painted and the journals are wrapped in oil impregnated canvas tape to prevent corrosion whilst it awaits a trip to be machined with the other wheelsets when they are ready.
The driver’s/right hand side of the cab has seen some investigative attention while it is decided whether any of it can be reused. The cant rail/part of roof section that was attached has been removed along with the upper bracket for the driver’s stone/wind deflector which has come up nicely with a quick clean. The next step is to remove the remaining beading and strengthening parts to clean scale trapped underneath.
11th December 2025
Work has started on 120’s tender ladder. This was gas axed off the back of the tender tank before that was sadly scrapped in Wales back in the 90s. One rung was missing and the new one has been installed and awaits welding. The drawings specify welds, but the originally these ones were rivet peened over. Steel stock is on hand to replace the missing ‘feet’ that were cut off. On closer inspection during the installation of the missing rung it has become clear that every other rung has snapped and been badly gas welded back on at some point. It is probable that because of this the remaining five rungs will also be replaced with new steel.
Another operating handle, the rear vacuum bag dummy and the third cab lifting hook have received their first coats of paint. A vacuum swan neck has also been pulled out of storage and the remains of the old vacuum pipe burnt out, but during that it was noticed that it is a smaller internal diameter than the other one that belongs to the loco, so presumably it belongs to a wagon or carriage.
The studs in the front pony truck axle box are all very much life expired and need to be replaced. Some came out with their nuts, but the remaining ones are extremely reluctant. One was removed with a lot of heat, but its longer partner started to unscrew before snapping. That will require careful removal in the future to preserve the thread in the casting.
3rd December 2025
The upper axle box assembly castings on the front truck are being cleaned of corrosion and receiving a protective coat of chemical rust converter to limit further corrosion until the truck is reassembled. The loco’s other vacuum dummy has been retrieved from storage, stripped of corroded parts and been cleaned and treated ready for paint. More of the cab linkage parts have been brought out for red paint to be applied, and second coats are going on the middle driving and front pony truck wheelsets.
The third cab lifting hook has been removed from the rear cab roof support, along with a small section of wood that had managed to cling on. A satisfyingly large amount of corrosion has been removed from it and it is now ready for paint. The fourth hook is evading discovery in the stored parts and may have to be replaced if it doesn’t turn up.
1st December 2025
After much heat, careful wedging and levering the left side front axlebox brass has been persuaded to come out.
25th November 2025
The strip down of the front pony truck continues, with more difficulties caused by large amounts of built up corrosion from the loco’s time in storage. We were told that the loco had suffered a hot axle box which precipitated its withdrawal. When the brass was removed from the right hand side it was obvious that it had run very hot. The whitemetal has melted past the level of the oil channels that should be present, and filled the holes where the lubricating oil should be able to enter from above. It also still smelt noticeably of burnt oil and wool, even after nearly 40 years since withdrawal. This will be dealt with during the overhaul process by replacing the whitemetal and remachining the axle journal to match it. More parts are going throught the painting process, with one of the cab handles closest to the camera.
19th November 2025
The left hand side axlebox under keep has finally been persuaded to slide out from the pony truck, allowing the front wheel set to be removed. During the 25-plus year period 120 has spent in outside storage in the UK water unfortunately managed to get into the axleboxes and has caused corrosion to the journal surfaces and damage to the whitemetal in the axleboxes. This will be dealt with during the overhaul process.
The replacement enamel signs that NG15s are fitted with to warn crews of overhead electric wires have arrived. The originals had unfortunately long since disapeared. These were made by A.J. Wells & Sons Ltd, who supply all of the enamel signs used by Transport for London.
13th November 2025
Work is underway to strip 120’s front truck for overhaul. It is currently upside down while the axlebox under keep slides are removed. The left hand side came out after about an hour of work, but the right hand side is proving to be more challenging. A previous repair has failed causing a crack, which means the structure at the outer edge cannot be used to overcome the corrosion holding it in place. It has been soaked in penetrative oil and efforts to persuade it to come out are ongoing. The under keep itself will require repair or replacement. The trimmings from the reservoirs have been discarded. New ones are on hand from South Africa. More parts of 120 are proceeding through the paint process, seen here with one of Matheran 740’s brake cross shafts.
The valve gear cutoff indicator and scale have also been test installed on the reverser assembly. The true 0% point needs to be ascertained before final installation.
5th November 2025
The new cutoff indicator is complete, replacing a broken and bent original. The cutoff scale itself is also polished, straightened and has had as many defects as possible removed.
Painting is underway on the driving wheel sets. At the moment there is a protective layer of paint on the journals, this well be removed prior to skimming.
3rd November 2025
A large amount of attention has focussed on 120’s reverser assembly. This had some overhaul work during the loco’s last works visit in South Africa, as witnessed by replacement screw shaft bearings and shimming to compensate for machinining to remove wear. It is now complete bar replacement shims which are on order, reinstallation of the cut off percentage scale and pointer and overhaul of the reverser hand wheel stop pawl. The tender vacuum dummy has also turned up in a box of parts, so that will join the front one in the cleaning and painting process.
The remaining corroded diffuser for the blow down valves has been sent to a local non-ferrous fabricators to be replicated in stainless steel. There are two diffusers, one on each side.
Oil drillings were present in both bearing castings for the reverser, but had not been drilled through the new bearings so that was done during the reassembly process.
21st October 2025
120’s front vacuum bag now has a new end seal. Investigation of the front vacuum brake upstand has found a broadly expected amount of corrosion and dents. Sadly the beautiful logoed 90 degree elbow is deformed from a previous attempt to remove the pipe screwed in to it so it doesn’t look like it can be saved.
The front headlamp bracket is approaching completion, and is now bolted back together. Painting has started on the front vacuum dummy and the driver’s side blow down valve vent has finally been seperated from its deflector cover.
Work on the reverser assembly is getting closer to completion, with reassembly in sight. The first coat of paint has gone on the main mechanism support, which has received new bolts where necessary. The drain cock linkage is now cleaned and temporarily fitted with its new soft spacer washers and split pin while the last coats of paint go on the drain cock handle. The gear indicator pointer and numbered scale have been carefully removed ready for repair and polishing. The screws were all very seized and had to be drilled. New brass fasteners have been ordered for them.
15th October 2025
Work continues on 120’s front headlamp mount and reverser assembly. The drain cock handle has been unseized and removed, cleaned and painting has started. New bolts have been ordered for the brackets on the side of the reverser mount. This has a later addition welded to it which will be left in place for now until its purpose becomes clear.
8th October 2025
Work continues on 120’s front lamp mount and both headlights. The remaining lamp assembly has gone to the draughtsman along with the new light units to be measured. For fans of the Ffestiniog Railway the meeting about the lamp design and the physical handover took place in the observation saloon of Van 11 😃. The front lamp mount had significant rust jacking that had caused distortion. Attempts to burn out the rust with oxy-acetylene were unsuccessful so a test area was cut out with a plasma cutter. This showed the corrosion plaque was bigger and more difficult to remove than first thought, so all six rivets holding the uprights on were removed and repairs carried out where necessary. The upper flat part is now getting painted. The rivets will be replaced with countersunk bolts when reassembled.
The front vacuum bag has been test reassembled. New clips are on order for it. The trust has a good stock of new Transnet Dunlop vacuum bags ordered from South Africa as part of a larger spares order.
23rd September 2025
More NG15 parts are making their way through the paint process. The lighter colours require several coats, especially on rougher surfaces. The lights ordered from WIPAC have arrived and are being checked for suitability.
22nd September 2025
Various cab and minor parts have come back from blasting, and design work is continuing on the headlights. Parts of one survive in corroded condition and the other is missing, so they will be replicated. The new ones will be designed to hold halogen headlamps as per the originals.
8th September 2025
More paint applied to 120’s reverser parts.
3rd September 2025
Work is continuing on the reverser assembly and is progressing very well. The front headlamp mount and the remains of the headlamp have been brought out of storage for repair. The original mount was designed to accomodate a large Stones headlamp which was later replaced by a box design holding two sealed beam units. These will be retained on 120. Only one is present which may be repaired, and a second one will be made by copying the original. A large amount of wastage, some incorrect positioning by the SAR fitter and gas axe damage from the dismantling procedure at Gelert’s Farm in the 90s were all repaired.
29th August 2025
The reverser has received more paint and the nut is loosely reassembled with painted bolts.
28th August 2025
The last half of the reverser nut has been removed, the thread cleaned and the bolts that hold the nut together cleaned and painted ready to go back together. The reverser handle has had its first coat of paint. The regulator handle has also had more paint. Happily South African Railways were very consistent with their colours so a batch of SAR parts can all be painted at once.
27th August 2025
120’s reverser has been blasted, and stripping is in progress. The reverser nut has proved to be difficult to unseize, and care is needed to not damage it during removal. One half is now off and the second is moving slowly with gentle persuasion. The front vacuum pipe is also stripped and will go into storage for a while until needed.
25th July 2025
The regulator, turbo generator brackets and a brake bar have all received more paint.
22nd July 2025
120’s regulator and steam generator brackets have had localised repairs and are being painted prior to storage
21st July 2025
120’s inner front headlamp support has been straightened out and put in the pile for blasting.
23rd June 2025
120’s smokebox door handles are the first part of the loco in service! They had a starring role in the Ffestiniog and Welsh Highland Railway’s ‘200 wheels’ cavalcade over the weekend as they are now fitted to classmate 134. They will return to 120 when it needs them.
18th June 2025
The smokebox door handle and dart are getting a coat of paint today in preparation for a trip to Wales over the weekend.
17th June 2025
The foundry in Germany has sent photos of 120’s builder’s plates nearing completion, and the final drafts of the new cab drawings have been sent through.
20th May 2025
Design work is now complete on 120’s cab, with strengthening and a revised swing seat arrangement for the crew included.
11th April 2025
Design work continues on 120’s cab. Discussions are ongoing about how to ensure sufficient strength to overcome an original design weakness and to accomodate the swinging cab seats.
11th March 2025
The lower axle box sections on 120’s pony trucks are now being prepared for removal. Most of the bolts are out, and the parts themselves should theoretically slide out. All the parts have been marked with a punch to ensure they go back in the same place.
10th March 2025
Work continues on stripping 120’s pony trucks. Most of the huge chunks of rust have been removed from the oil reservoirs and they are ready for final cleaning. The axle box covers are now removed for cleaning and painting.
8th March 2025
Work has started on the trailing pony truck assessing it for repair prior to painting and storage, and removing the wheelset so it can go to Boston Lodge to be reprofiled.
Most of the fasteners came straight out with an impact gun, and the rest of the work so far has concentrated on removing large plaques of corrosion from in hollows and inside the axle box oil reservoirs. The remains of the non-original lids for them have been removed as well.
27th February 2025
Good progress was made yesterday on stripping the leading driving axle from the front truck assembly. It was extremely reluctant to let go but the use of several chisel pry bars eventually persuaded it to separate with an almighty bang.
The last pallet of cleaned parts has also been unloaded, leading to a very impressive selection of NG15 components awaiting assessment and repair. The gloss black paint was out as well so a couple of pipe clips were painted as they are in the ‘don’t need repair’ pile and are now ready to go back on the locomotive when the time comes.
26th February 2025
Our extremely talented in house fabricator has made amazing progress with the cylinder covers. The difference from before is stark.
25th February 2025
Work has started on corrosion repairs to the cylinder end covers. Many of the thinner metal parts have suffered whilst in storage.
24th February 2025
Work over the weekend concentrated on stripping the front truck to release the wheelsets for overhaul. An exploratory clean of a cab window was also tried, and this morning another pallet of parts returned from being blasted.
21st February 2025
Design work has started on the replacement cab and tender tank. The gauging study kindly carried out by a Ffestiniog Railway volunteer has shown the original cab profile can be retained with some strengthening to prevent the distortion class members experienced in traffic from the length and weight of the cab roof. The diagram below shows the new cab design for WHR resident NG15 134 overlaid on the original South African Railways design that 120 will use. 134’s cab is shown in Yellow with glass side windows.

19th February 2025
The wheelsets, tender bogies and pony trucks are back from the blasters. The loose wheelsets have left for the Ffestiniog Railway’s Boston Lodge works for assessment. The leading driving axle, both pony truck wheel seats and two tender wheelsets are still to go when they have been removed from their respective homes.


15th February 2025



13th February 2025
120’s boiler, tender chassis and frames are now back in the workshop. They will stay in storage until Matheran 740 is further into its overhaul.
Project Gallery prior to January 2025